7155 SHADELAND STATION WAY, SUITE 160 INDIANAPOLIS, IN 46256
Menu
Lockerbie Road Rehabilitation
Contract/Project Number: CW-25-005
Project Location: Indianapolis, IN
Client: Indianapolis DPW
Owner: Indianapolis DPW
Owner PM, PE/PS and/or AE: Hector Mendoza
Project Length (miles or linear feet): 410 ft.
Project Construction Cost: $90,000
Project Date: January 2022
General Project Description
This project involves resurfacing the existing pavement and to remove and reset / salvage existing historic brick gutter along E. Vermont Street between N. Park Ave. and N. College Ave. in the Lockerbie neighborhood.