DPW Residential Streets
Contract/Project Number: ST-22-099
Project Location: Marion County
Client: Beam, Longest & Neff (BLN)
Owner: City of Indianapolis (DPW)
Owner PM, PE/PS and/or AE: Samuel Driffill
Project Length (miles or linear feet): 0.5 miles
General Project Description
HMA resurfacing for four (4) roadway segments within the City of Indianapolis. The roadway segments included in this scope of work are as follows:
- E. Vermont Street from Huber Street to Buren Place (approx. 880 linear feet)
- Buren Place from E. Michigan Street to E. Vermont Street (approx. 400 linear feet)
- Huber Street from E. Michigan Street to E. Vermont Street (approx. 390 linear feet)
- E. Michigan Street from Huber Street to N. Franklin Road (approx. 1,240 linear feet)
Scope of Services
RGI providing professional engineering services for the roadway segments resurfacing. Services include drainage evaluation and design, preparation of construction documents, and construction administration assistance during all phases of design and construction.
Any Unique Challenges or specialty which should be noted?
Evaluation of the various pavement sections and determining the appropriate rehabilitation methodology whether it is a simple mill and resurface or if HMA patching/subgrade treatment are needed